Home Page > Section 29; pages: 1, 2

Section 29: Signs for Engineering Trains and Test Trains

(Page 2 of 2)


A company called 'LaserThor' developed a system for removing rail head contamination using lasers. A number of trials were conducted, latterly with the laser equipment being mounted on a Multi Purpose Vehicle (MPV). In the autumn of 2003, trials took place at Oxshott and Wanborough on the Southern Region. Signs were installed at each test site to assist the MPV operator. A sign reading "laser on" [29.18] marked the start of the test site. This was followed by signs lettered "A", "B" and "C" [29.19] at intervals of a quarter mile. The last board in the series, worded "laser off" [29.20], was located one mile from the start of the test site.

[29.18] "Laser On" Sign.
Area: Oxshott / Wanborough   Usage: Low   Status: Historical
[29.19] Intermediate Signs.
Area: Oxshott / Wanborough   Usage: Low   Status: Historical
[29.20] "Laser Off" Sign.
Area: Oxshott / Wanborough   Usage: Low   Status: Historical

Leaf residue on the rail head can be removed by high-pressure water jetting. On the Scotland Territory, octagonal boards were installed from 2006 at the commencement and termination points of locations where water jetting is carried out. The board marking the commencement point bears the words "water jet" [29.21], while the board at the termination point is similar but has a diagonal red stripe superimposed [29.22].

[29.21] Commencement of Water Jetting Site. Click Here for Photo
Area: Scotland Territory   Usage: Low   Status: Current
[29.22] Termination of Water Jetting Site.
Area: Scotland Territory   Usage: Low   Status: Current

Water jetting sites between Shalford and Reigate on the North Downs Line are marked by five-sided boards with yellow borders. The first board, which has two columns of three diagonal bars [29.23], gives advance warning of a water jetting site. This board is followed by one with two columns of two bars [29.24], marking the point where water jetting should begin. A board with two bars, one above the other [29.25], denotes the point where water jetting should end.

[29.23] Advance Warning of Water Jetting Site.
Area: Shalford - Reigate   Usage: Low   Status: Uncertain
[29.24] Commencement of Water Jetting Site.
Area: Shalford - Reigate   Usage: Low   Status: Uncertain
[29.25] Termination of Water Jetting Site.
Area: Shalford - Reigate   Usage: Low   Status: Uncertain

During the autumn of 2006, marker boards lettered "A", "B" and "C" [29.26 - 29.28] were provided between Ockley and Warnham (Southern Territory) for autumn measurement testing. These signs concerned both the notified MPV treatment train and the Southern test train but with different meanings applying to each. To the treatment train, the "A" marker board [29.26] indicated the point where the notified test specific treatment should be applied. The "B" marker board [29.27] was disregarded by the treatment train, and when the "C" marker board [29.28] was reached, it returned to its usual treatment diagram. For the test train, the "A" marker board [29.26] meant "prepare to conduct brake test". A full service brake application had to be made when the "B" marker board [29.27] was reached. The "C" marker board [29.28] did not apply to the test train.

[29.26] "A" Marker Board.
Area: Ockley - Warnham   Usage: Low   Status: Historical
[29.27] "B" Marker Board.
Area: Ockley - Warnham   Usage: Low   Status: Historical
[29.28] "C" Marker Board.
Area: Ockley - Warnham   Usage: Low   Status: Historical

The High Output train (Track Renewal System) is a mechanised system for carrying out plain line track renewals. Ordinarily, the train would be stopped at the preceding controlled signal before moving forward to the work site. As part of a trial undertaken on the London North Eastern and East Midlands Routes in 2014 aimed at maximising the production time during a single shift, the train will stop at the actual site of work before a possession is taken around it. This is known as the "Flexible Train Arrival Point" (FTAP), and its position is denoted by a temporary marker at the lineside [29.29]. A series of countdown markers [29.30] is erected on the approach to the stopping point.

[29.29] FTAP Stopping Point Marker.
Area: LNE and EM Routes   Usage: Medium   Status: On Trial
[29.30] FTAP Countdown Markers ( (a) - Outer board; (b) - Intermediate board; (c) - Inner board ).
Area: LNE and EM Routes   Usage: Medium   Status: On Trial